Locally saved checklist
1.0 Preparation Tracker
Protect important saves and move through launch day deliberately. Nothing leaves this browser.
0 of 11 ready0%
Before launch
Record active quests
Note unfinished objectives so progression changes are visible.
Open related guide →Record current skill point total
The Early Access maximum is 184 and requires 1.0 verification.
Open related guide →Record the current Flame level
Keep the current materials and completed boss trophies noted.
Open related guide →Save the server configuration
Store a password-redacted copy with the world backup.
Open related guide →Note important unfinished content
Record builds, quests, and base projects that matter to the group.
Launch day
Read the 1.0 patch notes
Wait for the complete official changelog before assuming previewed values shipped.
Open related guide →Update the dedicated server
Do not open the production world until the server version is confirmed.
Verify client and server versions match
Record the exact build on both sides before troubleshooting.
Open related guide →Test important worlds from a copy first
Keep the final pre-1.0 archive untouched.
Open related guide →